Key Takeaways
- Send a complete package: a 3D STEP model, a 2D PDF/DXF drawing, and a clearly matched BOM for assemblies.
- State material grade, general tolerance (for example ISO 2768-m), critical dimensions, surface treatment and quantity directly on the drawing.
- Specify inspection requirements, including First Article Inspection (FAI) and the dimensional report you need.
- Add destination, annual volume and target delivery so the quote covers packaging and logistics.
- You can upload drawings directly through the Request a Quote form (PDF, STEP/STP, IGES/IGS, DXF, JPG/PNG), or send them on WhatsApp for a quick feasibility check.
Overseas buyers often lose days to back-and-forth because an RFQ arrives without a material, a tolerance or a finish. A tidy RFQ package lets a factory quote correctly the first time. This is the checklist we ask for on custom metal fabrication projects at our Qingdao factory.
1. The three core files: STEP, PDF/DXF and BOM
The 3D STEP model (or IGES) defines geometry and is used for CAM programming and DFM review. The 2D drawing, in PDF or DXF, carries what the model cannot: tolerances, thread callouts, material, surface finish and notes. For assemblies or welded structures, add a BOM that lists item number, description, material, quantity and whether the part is made to print or purchased. Keep revision letters identical across all files.
| File | Preferred format | What it must contain |
|---|---|---|
| 3D model | STEP / STP, IGES / IGS | Final geometry at the current revision |
| 2D drawing | PDF / DXF | Material, ISO 2768 class, critical tolerances, threads, surface finish, notes |
| BOM | PDF or message table | Item no., description, material, quantity, make or buy |
| Inspection requirements | PDF or note in the inquiry | FAI, dimensional report, sampling, certificates |
| Commercial data | Email or form | Prototype and batch quantity, annual volume, destination, target delivery |
2. Mark finish, treatment and welding on the drawing
Write the material grade (for example 6061-T6, 304, Q355B or 42CrMo), the surface treatment (anodizing type and colour, powder coating colour in RAL or Pantone, zinc plating, e-coating, black oxide) and any heat treatment with target hardness in HRC. For welded parts, state the welding process preference, weld quality level required and which surfaces must be machined after welding. A quick photo of a reference sample or the target application helps the engineer to judge function.
3. Define inspection: FAI and reports
First Article Inspection (FAI) measures the first part from a production run against every dimension on the drawing, normally on a ballooned drawing. Ask for it on new designs, tight tolerances and assemblies. We support first-article inspection and shipment dimensional reports on request, and you should state the report format, number of samples and any material or coating certificates you need. Mark the critical-to-function dimensions so inspection effort goes where it matters.
4. Add commercial details
Give the prototype quantity, expected batch quantity and annual volume, because price breaks depend on them. Include the destination port or country and your preferred trade term so packaging and logistics are quoted correctly. Standard batch lead time is 35–40 days, confirmed against the drawing and quantity.
5. Name clearly and upload
Name each file with the part number and revision, for example PN1234_RevB.step and PN1234_RevB.pdf. Upload up to 5 files (PDF, STEP/STP, IGES/IGS, DXF, JPG/PNG) directly through the Request a Quote form, or send drawings and photos by WhatsApp for a fast feasibility check.
Sourcing FAQ
Which file formats should I send for a custom metal fabrication quote?
Send a 3D STEP/STP (or IGES/IGS) model plus a 2D drawing in PDF or DXF. Our inquiry form also accepts JPG and PNG reference images. The 3D model defines geometry; the 2D drawing carries tolerances, threads, material and finish, so both are needed for an accurate quote.
What is a First Article Inspection (FAI) and should I request it?
FAI is a documented dimensional check of the first part from a new production run against the drawing, usually on a ballooned drawing. Request it for new designs, tight tolerances or assemblies. We provide first-article inspection and shipment dimensional reports on request; confirm the format and sampling plan in the RFQ.
How fast can I get a quote, and what is the lead time?
Complete packages with drawings, material, finish, quantity and destination can be reviewed quickly, and our engineers reply with questions or DFM comments if anything is missing. Standard batch lead time is 35–40 days, confirmed at quotation against drawing and quantity.
Next step: send your drawings for an engineering review and quote
Upload your files through Request a Quote (PDF, STEP/STP, IGES/IGS, DXF, JPG/PNG), or send drawings and photos on WhatsApp (+8613964269123) for a fast feasibility check. You can also email sales@xshuntai.com. Our engineers give DFM feedback before quoting; standard batch lead time is 35–40 days, confirmed against drawing and quantity.
